The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.
According to different requirement and stock blender, pneumatic tapping cutter and manual straight shank cutter could be equipped.
There are several types of guide blocks for your choice and hydraulic adjustable blocks are also available. Steel split type with copper bushing; Steel split type with nylon bushing; Nylon split type; Steel split type.
The mixing mill is equipped with break caps which will be broken when overloaded in order to protect the main parts from being damaged due to overloading.When emergency, simply pulling the rope or pushing the button with initiate the electro-hydraulic brake, makes the rolls stop rotating imediately
Model | XK-660 | XK-550B | XK-450 | XK-400 | XK-250 |
(D/L) Roll Size | 660×2130 | 550×1530 | 450×1200 | 400×1000 | 250×620 |
Production | 160~170Kg/once | 50~60Kg/once | 30~50Kg/once | 25~35Kg/once | 10~15Kg/once |
Motor Power(KW) | 220KW | 90/110KW | 55KW | 45/37KW | 18.5KW |
Line Speed(M/Min) | 34.2M | 28.6M | 21.8M | 19.3M | 15.5M |
Front Roll RPM | 16.5 | 16 | 15.4 | 15.4 | 19.8 |
Gear Ration | 47/ Dual Output | 47.5/Dual Output | 50 | 50 | 50 |
Roll Radio | 1: 1.24 | 1: 1.22 | 1: 1.27 | 1: 1.27 | 1: 1.10 |
Weight KG | 49800 | 18500/25000 | 11800 | 7500 | 3300 |
Temp. Control | Steam/Cool water | ||||
Emergency Stop | 2 foot step on 4 sets of press buttons | ||||
Container Volume | 55.5m³ | 23m³ | 16m³ | 12m³ | 10m³ |
Dimension(L*W*H)mm | 6200×3350×2670 | 5365×1946×2193 | 4558×1665×2015 | 4001×1500×1870 | 3220×1500×1290 |
Transmission | Low noise gear box |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB.Customer can specify the brand.
3. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.