Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Highlights:
1,Plunger is made of chilled cast iron.It is accurately processed and have high etch and wear resistance.
2,It's of high automation level and compact advanced structure:The control system has been taken up with PLC so as to realize multi program automatic control of curing process,providing a high efficiency of production and low intensity of labor.
3,Installed with hydraulic automatic side edge iron device.
No | Name | Technology Parameter | |
1 | Quantity | 12 units/group | |
2 | Cavity quantity | 2 or 4 | |
3 | Tire size | 10''-21'' | |
4 | Tire section | 2.50''-6.00'' | |
5 | Max. mold close force | 120T / mold | |
6 | Press Oil cylinder | Model | Piston |
Press Oil Cylinder | 300x50, 2 pieces | ||
speed | 6mm/s | ||
7 | Lifting Oil Cylinder | Size | 63/45x1450 |
Speed | 110mm/s | ||
8 | Heating plate OD | Φ900mm | |
9 | Mold height | 110-220mm | |
10 | Green tire height | Max. 450mm | |
11 | Heating plates space | 900mm | |
12 | Center mechanism | Tr130*4teeth/inch(Tr95*4 teeth/inch) |
|
13 | Mold close speed | 100mm/s | |
14 | Shaping steam Pressure | Not more than 0.3Mpa | |
15 | Low press steam pressure | 0.8Mpa | |
16 | High press steam pressure | 1.4Mpa | |
17 | Media inside bladder | Steam/nitrogen | |
18 | Curing tire quantity | 2 pcs/unit per time. 30 min /pcs,32 pcs/shift | |
19 | Air pressure | 0.8Mpa | |
20 | Pump motor power | 37KW, 1440rap | |
21 | Control voltage | DC24V |
Manufacturing process:
1. All produces are designed with SolidWorks and have finite-element analysis to ensure the quality.
2. All welding materials such as steel plates, merchant steel are cleaning and surface de-rusting before welding
3. Large welding parts are weld with submerged-arc welding and have weld inspection test.
4. After weld , welding parts have stress relieving treatment
5. CNC (computerized numerical control) plasma cutting device are used to cut the steel plate to reduce the deformation
About Us:
Qingdao Delphy Technology Development Co., Ltd.
---Tire machinery, conveyor belt equipment & solutuon
Who we are:
DLFTECH is a technology and equipment provider specializing in tire and conveyor belt industry. In accordance with the development concept of "integration, innovation, transcendence, and leading", we strive for getting through the whole process of tire and conveyor belt industry in terms of realizing Industry 4.0, aiming for bringing new profit growth and lasting market competitiveness to clients and helping them in creating greater social value.
What we do:
1.New material, new technique, new equipment.
2.One-stop solution: DLFTECH focuses on EPC project for the completion of tire and conveyor belt factory.
3.Transformation and upgrading of equipment.
Interactions:
Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.
Service
Plant engineering - We provide FREE layout design for new plant.
Supplier Integrity - 24/7 working machines, extremely reliable.
Plant Installation Support - Installation&commissioning service.
Spare Parts - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization - Overseas engineers available.
Training - We provide FREE training for new plant.
Raw Materials - Raw material support exported from China.
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Foreign Customers Visit Factory:
Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China