Tire Building Machine
This machine is suitable for forming protoconchs motorcycle and motorcycle tire tire vacuum tyre. Set stickers, on the wire ring, curtain anti-package, paste the tread and compaction in one, a high degree of automation, good quality imitation of the carcass.The machine also has a compact structure, easy operation, easy maintenance features, is the more common domestic tire molding equipment.
Spring Turn-up Building Machine Main Technology Parameters:
1 |
Item |
Specifications apply: |
8″~14″/15″~21″
Motorcycle tyre :8″~14″/15″~21″ |
Bs
Tyre carcass Bs range |
100mm(Bs80mm,370mm)
Can adjustable 100(Bs min : 80mm, max:370mm) |
Productivity: |
250-400
250-400 pieces per shift |
Mainly motor power: |
2.2kw |
Supplying cloth frame layer qty: |
1-5
1-5 layer |
Building methods: |
Single layer or multi-layer fabric, Automatic intermittent package building |
Spindle height: |
900mm
Spindle height of building drum is 900mm from ground:900mm |
Compressed air: |
0.6-0.7MPa |
Outline: |
2300X2500X2150mm |
Weight: |
3000kg
3000kg |
2 |
Building drum: |
Building drum: |
Drum up one time. The size can be adjustable. |
Building drum rotating speed |
Max100rpm/min |
3 |
Curtain |
Curtain lining cloth maximum width: |
600mm |
Curtain lining cloth max diameter |
500mm |
Cord Curtain Curly square shaft size: |
32X32mm |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.
Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.
Our products:
Tire making machines:
Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.
Conveyor belt making machines:
Vulcanizing press.
Rubber mat making machines
Inner tube making machines
Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.
Service
Plant engineering - We provide FREE layout design for new plant.
Supplier Integrity - 24/7 working machines, extremely reliable.
Plant Installation Support - Installation&commissioning service.
Spare Parts - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization - Overseas engineers available.
Training - We provide FREE training for new plant.
Raw Materials - Raw material support exported from China.
Foreign Customers Visit Factory