Customization: | Available |
---|---|
Certification: | ISO |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.
1.The rolls are made from LTG-H alloy chilled cast iron by centrifugal casting technology, achieved surface hardness HS 68 ~ 75. Roll surface is grinding processed and there are smooth, partial grooved, half grooved, complete grooved surfaces and hollow, drilled or non-drilled types according to different purpose.
2.Bearings for the rolls are double-row bearings, which are convenient for maintenance and have a long service life.
3.Motor and reducer is connected with elastic ring coupling. The reducer is hardened close transmission reducer. According to different model or customer's requirement, it could equip with single or dual output type. Connection from reducer to the rolls is with nylon rod pin universal couplings.
Model | XK-660 | XK-550B | XK-450 | XK-400 | XK-250 | |||
Roll Size | 660×2130 | 550×1530 | 450×1200 | 400×1000 | 250×620 | |||
Production | 160~170Kg/once | 50~60Kg/once | 30~50Kg/once | 25~35Kg/once | 10~15Kg/once | |||
Motor Power(KW) | 220KW | 90/110KW | 55KW | 45/37KW | 18.5KW | |||
Line Speed(M/Min) | 34.2M | 28.6M | 21.8M | 19.3M | 15.5M | |||
Front Roll RPM | 16.5 | 16 | 15.4 | 15.4 | 19.8 | |||
Gear Ration | 47/ Dual Output | 47.5/Dual Output | 50 | 50 | 50 | |||
Roll Radio(D/L) | 1: 1.24 | 1: 1.22 | 1: 1.27 | 1: 1.27 | 1: 1.10 | |||
Weight KG | 49800 | 18500/25000 | 11800 | 7500 | 3300 | |||
Temp. Control | Steam/Cool water |
|||||||
Emergency Stop | 2 foot step on 4 sets of press buttons |
|||||||
Container Volume | 55.5m³ | 23m³ | 16m³ | 12m³ | ||||
Dimension(L*W*H)mm | 6200×3350×2670 | 5365×1946×2193 | 4558×1665×2015 | 4001×1500×1870 | ||||
Transmission | Low noise gear box |
1.As soon as our equipmemt arrive at destination,we will send our engineer to install it and adjust it.Engineer will be sent to help you installing the machine, debugging the machine,training your worker, until your machines working normally and your workforce operate skillfully(can negotiate )
2.Guide and train your workers to operate our equipment.
3.Quality gurantee period is one year from installment and adjusting(not include knife and screen)
4.Handle the letter of customers timely,solve customers questions.Collect the suggestion by kinds of ways and improve it.
5.Provide life-time Technical support for our customers.
Offer spare parts.
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB.Customer can specify the brand.
3. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.