Batch-off Cooling Line/Rubber Cooling Lines

Product Details
Customization: Available
Certification: ISO
Condition: New
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (28)
  • Batch-off Cooling Line/Rubber Cooling Lines
  • Batch-off Cooling Line/Rubber Cooling Lines
  • Batch-off Cooling Line/Rubber Cooling Lines
  • Batch-off Cooling Line/Rubber Cooling Lines
Find Similar Products

Basic Info.

Model NO.
XPG
Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
Voltage
380V/415V/450V/220V
Color
Customer Made
Co
ISO BV
Brand
Maoyuanfeng
Country of Origin
China
Production Capacity
20sets/Month, 200units/Year
Electronics
World Famous Brand
Type of Machine
Material Processing Machine
Warranty
One Year
Packaging
Wood Carton
Transport Package
Wood Carton
Specification
BV, SGS, CE, ISO9001
Trademark
MYF
Origin
China

Product Description

Product Profile:
  The batch off cooling machine is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.
Specification Technology Parameter:
        Model XPG-600 XPG-800 XPG-900
Max Rubber Sheet Width 600 800 900
The Thickness Of Rubber Sheet (mm)
 
4-10 4-10 6-12
Linear Speed of Taking-in Sheet 11~22m/min 0~26m/min 3~35m/min
Axial Fan 0.37KW  5760m3/h 0.37KW  5760m3/h 0.37KW  5760m3/h
Swing range and frequency 1.3m 10-16/min 1.3m 10-16/min 1.3m 10-16/min
Rubber strip temperature after cooling ≤Room temperature+5ºC ≤Room temperature+5ºC  
≤Room temperature+5ºC
Speed-adjusting frequency motor of lifting device XWD5.5-1/23 XWD5.5-1/23 XWD5.5-1/23
Speed-adjusting frequency motor of rubber swing device XWD1.1-5-1/87 XWD1.1-5-1/87 XWD1.1-5-1/87
Rubber bar pitch 160 or 101.6 160 or 101.6 160 or 101.6
Max hanging height of rubber strip 1400mm 1400mm 1400mm

Our Machine Advantage:
  there are two structure types: overhead and floor-standing types, whose hanging racks are vertically turning with compulsive cooling. The rubber strip hanging bar adopts step by step cylinder or motor-reducer for driving. It consists of mainframe and electrical control system. The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting device, hanging strip cooling, auto wig wag section, weighing, handrail, platform and supporting bracket etc. The electrical control system consists of main control cabinets, and there're emergency stop device in key areas.
  Clients can choose high or low disposition according to the practical requirements. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio≤100mm;there are three working positions for auto entering and outputting of material tray; auto rubber collecting device; auto cutter device; it has high automatization and can realize nobody operating.
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
   A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
   A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC:
   A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
   A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
   A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
   A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
   A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Tel:+86-532-86133233
Fax:+86-532-86133233
Cell:+86-178-5427-5726

Batch-off Cooling Line/Rubber Cooling Lines

Batch-off Cooling Line/Rubber Cooling Lines









 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier