Customization: | Available |
---|---|
Certification: | ISO |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rubber Mixing mill is used for mixing and kneading raw rubber, synthetic rubber, thermoplastics or E.V.A. with chemicals into even materials. The even materials can be fed to calender, hot presses or other processing machiner for making rubber or plastic products. It adopts dual output reducer, the front and behind roller can be driven separately with rolling bearing structure, the roller can adopts hollow center groove roller or drilling hole smooth roller against difference using scope as mixing, refining or press pieces etc.
Model | XK-660 | XK-550B | XK-450 | XK-400 | XK-250 | |||
Roll Size | 660×2130 | 550×1530 | 450×1200 | 400×1000 | 250×620 | |||
Production | 160~170Kg/once | 50~60Kg/once | 30~50Kg/once | 25~35Kg/once | 10~15Kg/once | |||
Motor Power(KW) | 220KW | 90/110KW | 55KW | 45/37KW | 18.5KW | |||
Line Speed(M/Min) | 34.2M | 28.6M | 21.8M | 19.3M | 15.5M | |||
Front Roll RPM | 16.5 | 16 | 15.4 | 15.4 | 19.8 | |||
Gear Ration | 47/ Dual Output | 47.5/Dual Output | 50 | 50 | 50 | |||
Roll Radio(D/L) | 1: 1.24 | 1: 1.22 | 1: 1.27 | 1: 1.27 | 1: 1.10 | |||
Weight KG | 49800 | 18500/25000 | 11800 | 7500 | 3300 | |||
Temp. Control | Steam/Cool water |
|||||||
Emergency Stop | 2 foot step on 4 sets of press buttons |
|||||||
Container Volume | 55.5m³ | 23m³ | 16m³ | 12m³ | ||||
Dimension(L*W*H)mm | 6200×3350×2670 | 5365×1946×2193 | 4558×1665×2015 | 4001×1500×1870 | ||||
Transmission | Low noise gear box |
1.The rolls are made of chilled cast iron with vanadium and titanium alloys. The roll face is hard and anti-wear. To heat up or cool down, the rolls are either circumferentially drilled or centrally bored so as to make temperature well proportioned on the roll surface.
2.The machine is equipped with a hydraulic relief device. When an emergent accident happens, just press down the button and the machine will stop immediately.1t is safe and reliable.
Bearings for the rolls are double-row bearings, which are convenient for maintenance and have a long service life.
Motor and reducer is connected with elastic ring coupling. The reducer is hardened close transmission reducer. According to different model or customer's requirement, it could equip with single or dual output type. Connection from reducer to the rolls is with nylon rod pin universal couplings.
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB.Customer can specify the brand.
3. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.