Customization: | Available |
---|---|
Certification: | ISO |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.
Rubber Mixing mill is used for mixing and kneading raw rubber, synthetic rubber, thermoplastics or E.V.A. with chemicals into even materials. The even materials can be fed to calender, hot presses or other processing machiner
for making rubber or plastic products. It adopts dual output reducer, the front and behind roller can be driven separately with rolling bearing structure, the roller can adopts hollow center groove roller or drilling hole smooth roller against difference using scope as mixing, refining or press pieces etc.
1The rolls are made of chilled cast iron with vanadium and titanium alloys. The roll face is hard and anti-wear. To
heat up or cool down, the rolls are either circumferentially drilled or centrally bored so as to make temperature well proportioned on the roll surface.
The machine is equipped with a hydraulic relief device. When an emergent accident happens, just press down the button and the machine will stop immediately.1t is safe and reliable.
Bearings for the rolls are double-row bearings, which are convenient for maintenance and have a long service life.
The main body consists of chassis, left and right frame, left and right cover and other components. The chassis could be customized to complete type or seperate type. The main body is fabricated structure, stress relieved by annealing processed after fabricating.
Model | XK-660 | XK-550B | XK-450 | XK-400 | XK-250 |
(D/L) Roll Size | 660×2130 | 550×1530 | 450×1200 | 400×1000 | 250×620 |
Production | 160~170Kg/once | 50~60Kg/once | 30~50Kg/once | 25~35Kg/once | 10~15Kg/once |
Motor Power(KW) | 220KW | 90/110KW | 55KW | 45/37KW | 18.5KW |
Line Speed(M/Min) | 34.2M | 28.6M | 21.8M | 19.3M | 15.5M |
Front Roll RPM | 16.5 | 16 | 15.4 | 15.4 | 19.8 |
Gear Ration | 47/ Dual Output | 47.5/Dual Output | 50 | 50 | 50 |
Roll Radio | 1: 1.24 | 1: 1.22 | 1: 1.27 | 1: 1.27 | 1: 1.10 |
Weight KG | 49800 | 18500/25000 | 11800 | 7500 | 3300 |
Temp. Control | Steam/Cool water | ||||
Emergency Stop | 2 foot step on 4 sets of press buttons | ||||
Container Volume | 55.5m³ | 23m³ | 16m³ | 12m³ | 10m³ |
Dimension(L*W*H)mm | 6200×3350×2670 | 5365×1946×2193 | 4558×1665×2015 | 4001×1500×1870 | 3220×1500×1290 |
Transmission | Low noise gear box |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB.Customer can specify the brand.
3. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.