Global Service Rubber Mixing Mill for Rubber Seal Strip Plant

Product Details
Customization: Available
Certification: ISO
Condition: New
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (28)
Global Service Rubber Mixing Mill for Rubber Seal Strip Plant pictures & photos
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant pictures & photos
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
  • Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • FAQ
Overview

Basic Info.

Model NO.
XK
Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
Color
Customized
Country of Origin
China
Brand
Maoyuanfeng
Electronics
World Famous Brand
Transport Package
Wood Carton
Trademark
maoyuanfeng
Origin
China
Production Capacity
220units/Year

Product Description

Product Description

The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.
Rubber Mixing mill is used for mixing and kneading raw rubber, synthetic rubber, thermoplastics or E.V.A. with chemicals into even materials. The even materials can be fed to calender, hot presses or other processing machiner
for making rubber or plastic products. It adopts dual output reducer, the front and behind roller can be driven separately with rolling bearing structure, the roller can adopts hollow center groove roller or drilling hole smooth roller against difference using scope as mixing, refining or press pieces etc.


 

Detailed Photos

1The rolls are made of chilled cast iron with vanadium and titanium alloys. The roll face is hard and anti-wear. To
heat up or cool down, the rolls are either circumferentially drilled or centrally bored so as to make temperature well proportioned on the roll surface.
Global Service Rubber Mixing Mill for Rubber Seal Strip PlantGlobal Service Rubber Mixing Mill for Rubber Seal Strip PlantGlobal Service Rubber Mixing Mill for Rubber Seal Strip PlantGlobal Service Rubber Mixing Mill for Rubber Seal Strip Plant
The machine is equipped with a hydraulic relief device. When an emergent accident happens, just press down the button and the machine will stop immediately.1t is safe and reliable.

Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
Global Service Rubber Mixing Mill for Rubber Seal Strip Plant

Bearings for the rolls are double-row bearings, which are convenient for maintenance and have a long service life.
Global Service Rubber Mixing Mill for Rubber Seal Strip PlantThe main body consists of chassis, left and right frame, left and right cover and other components. The chassis could be customized to complete type or seperate type. The main body is fabricated structure, stress relieved by annealing processed after fabricating.

 

Global Service Rubber Mixing Mill for Rubber Seal Strip Plant
Global Service Rubber Mixing Mill for Rubber Seal Strip Plant

 

Product Parameters
Model XK-660 XK-550B XK-450 XK-400 XK-250
(D/L)                     Roll Size 660×2130 550×1530 450×1200 400×1000 250×620
   Production 160~170Kg/once 50~60Kg/once 30~50Kg/once 25~35Kg/once 10~15Kg/once
                  Motor Power(KW) 220KW 90/110KW 55KW 45/37KW 18.5KW
                      Line Speed(M/Min) 34.2M 28.6M 21.8M 19.3M 15.5M
                   Front Roll RPM 16.5 16 15.4 15.4 19.8
Gear Ration 47/ Dual Output 47.5/Dual Output 50 50 50
                   Roll Radio 1: 1.24 1: 1.22 1: 1.27 1: 1.27 1: 1.10
               Weight KG 49800 18500/25000 11800 7500 3300
   Temp. Control Steam/Cool water
   Emergency Stop                                                                                                                                                                                                                         2 foot step on 4 sets of press buttons
                Container Volume 55.5m³ 23m³ 16m³ 12m³ 10m³
           Dimension(L*W*H)mm 6200×3350×2670 5365×1946×2193 4558×1665×2015 4001×1500×1870 3220×1500×1290
               Transmission                                                                                                                                                                                                                                                        Low noise gear box
FAQ

FQA-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
          A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB.Customer can specify the brand.
3.       Q: How to control the quality?
          A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
           A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
           A: 2 years after machine arrived at factory
2.        Q: How to solve the problem?
           A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier