Shandong, China
Business Type:
Manufacturer/Factory
Number of Employees:
20
Year of Establishment:
2010-08-20
Management System Certification:
ISO 9001, ISO 14001
Average Lead Time:
Peak season lead time: 3-6 months
Off season lead time: 1-3 months
OEM/ODM Service
Sample Available

Curing Machine, Rubber Tyre Curing Press, Motorcycle Rubber Tyre Curing Press manufacturer / supplier in China, offering Motorcycle Rubber Tyre Tire Curing Machine with ISO BV SGS, Waste Tyre Recycling Machine/Rubber Recycling Machinery/Rubber Powder Production Line, Waste Tire Recycling Machine for Rubber Powder and so on.

Diamond Member Since 2016
Audited Supplier
Supplier Homepage Products Motorcycle tire curing press Motorcycle Rubber Tyre Tire Curing Machine with ISO BV SGS

Motorcycle Rubber Tyre Tire Curing Machine with ISO BV SGS

Get Latest Price
Min. Order: 1 Piece
Port: Qingdao, China
Production Capacity: 150 Units
Payment Terms: L/C, T/T
Certification: ISO
Condition: New
Customized: Customized
Automatic Grade: Automatic
Structure: Vertical
Country of Origin: China

You Might Also Like

Loading...

Basic Info

Model NO.: MLB
PLC: Siemans
Hydraulic System: Yuken / Rexroth / Parker
Packaging: Wood Carton
Brand: Maoyuanfeng
Trademark: MYF
Transport Package: Wood Carton
Origin: China

Product Description

Product Porfile:
This press can realize tire loading, shaping, vulcanizing and unloading automatically. Tire can be cooled automatically with post cure inflator. It can adopt two-half mould and segmented mould.

Structure characteristics:
The machine consists of frame, mould opening/closing device, mould adjusting device, center mechanism, curing chamber, loading device, tire unloading device, hydraulic system, electrical system, pipeline system and post cure inflator etc.
Electrical Control system:It adopts PLC as control center, which has touch screen for display unit. The touch screen can display curing state, we can realize the man-machine conversation, such as technology choosing and parameters modification etc.

Our Machine Advantage:
  Hydraulic pressure drives the mould opening/closing and center mechanism.
  Multi-cylinder provide pressure to make even force and small deformation on platens
  The safety lock can make sure the safety for maintenance
  The mould height can be adjusted automatically
  The hydraulic system adopts Yuken, Rexroth, Parke world famous brand which can work safely, reliably and without any leakage
  Low energy consumption
  Advanced control system can finish the setting of vulcanizing and parameter changing rapidly.

Technology Parameter:
TypeMLB-650/40MLB-800/60MLB-800/100
Largest mold closing force (T)25-406080-90
Hot plate diameter (mm)500-650800800-840
Hot plate clearance (mm)300-600500-600600-650
Applicable rim diameter (inch)4"-5"-6"-8"8"-16"16"-18"
Mold quantity (set)221
Diameter of piston (mm)200200290
Diameter of center pole (mm)25-3535-4040
Stroke of center pole (mm)200200300
Working press (Mpa)0.6-0.80.6-0.80.6-0.8
Internal air pressure (Mpa)1.81.81.8
Internal steam pressure (Mpa)0.8-1.50.8-1.50.8-1.5
Preshaping inter pressure (Mpa)0.1-0.20.1-0.20.1-0.2
Motor power (KW)7.57.511
Machine outline(LxWxH) (mm)1200x900x23002400x900x29102400x900x2910
Weight (kg)250028003500
 
FQA-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       Q:  Which PLC:
          A:  Siemens, Omron, Mitsubishi
4.       Q:  How to control the quality?
          A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q:  When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q:  What is the warranty time?
           A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
           A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Send your message to this supplier

*From:
*To:
avatar Ms. Amy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now