Warranty: | 1 Year |
---|---|
Certification: | CE, ISO |
Condition: | New |
Customized: | Customized |
Automatic Grade: | Automatic |
Structure: | Horizontal |
Customization: |
---|
Suppliers with verified business licenses
No. | Description | Specification |
1 | Model | Platen/ Double cavity/ Horizontal/Mechanical type tire curing press |
2 | No of Cavity | Two (2) |
3 | Type of Opening | Mechanical horizontal Type |
4 | Mould Heating Method | Platen |
5 |
Press Closing force per Cavity (Squeezing Force) |
2890KN |
6 |
Max opening / closing time , | 75 Seconds 75 |
7 | Press Motor Power | 16Kw |
8 | Maximum Internal Pressure | 28 bar |
9 |
Maximum Dome/Platen Pressure | 14 bar |
No. |
Description |
Specification |
1 | Bead diameter range | 15″~ 20″ |
2 | Green tire height | 760 mm |
3 |
Green Tire Outer Diameter | φ1180 |
4 |
Cured Tire Outer Diameter | φ1180 |
5 | Cured Tyre Height | 235 mm to 400 mm |
6 | Cured Tyre Weight | Max. 100kg |
SPECIFICATIONS FOR MECHANICAL CURING PRESS OR SEMI-HYDRAULIC CURING PRESS |
||||
Model |
48'' |
55'' |
63.5'' |
65'' |
No. of Cavity |
2 |
2 |
2 |
2 |
ID. of Heat Shield |
1220 |
1400 |
1600 |
1640 |
Max.Closing Force(Kn) |
1960*2 |
2980*2 |
4220*2 |
4580*2 |
Mold Height(Mm) |
250-510 |
250-520 |
254-635 |
350-650 |
Bead Dia. |
14''-20'' |
15''-22'' |
16''-24'' |
19''-24.5'' |
Max. Green Tire Diameter(Mm)-In Two-piece Mold |
900 |
1070 |
1270 |
1225 |
Max. Green Tire Diameter(Mm)-In Segmented Mold |
10900 |
1000 |
1130 |
1225 |
Opening/Closing Time |
60 |
60 |
82 |
82 |
Heating method |
Platen |
Platen |
Platen |
Platen |
Mold opening way |
Move horizontally Turn over |
Move horizontally Turn over |
Move horizontally Turn over |
Move horizontally Turn over |
Centre Mechanism |
BOM |
BOM |
BOM |
BOM |
Mold adjustment method |
Electrically |
Electrically |
Electrically |
Electrically |
1. Engineering design
Provides engineering design consultation and technical service of rubber product industry in:
Process, planning, construction, structure, water supply and drainage, heating and ventilation, air conditioning, power,electric, communication and automatic-control,logistics and cost budget.
2. Equipment of production according to the processes
3. Equipment of utilities
4.Installation and commissioning
5. Other :
Land
Civil construction of workshop
Freight of equipment
Liquidity(Proqurement of raw materials and wages in the trial production stage )
Pre-project cost (Project examine and approval)
Personnel training(Plant technical personnel, management personnel, operation)
Unforeseen expenses(0.5% of total project construction investment)
Travel and business entertainment expenses
myfrubbermachine.en.made-in-china.com
Suppliers with verified business licenses