Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press

Product Details
Customization: Available
Country of Origin: China
PLC: Siemans
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (28)
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
  • Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
Find Similar Products

Basic Info.

Model NO.
XLB-D 2000
Hydraulic System
Yuken / Rexroth / Parker
Packaging
Wood Carton
Brand
Maoyuanfeng
Transport Package
Wood Carton
Specification
18"/22"/24"/26"/28"/32"
Trademark
MYF
Origin
China
Production Capacity
150 Units

Product Description

Product Profile:
This press can realize tire loading, shaping, vulcanizing and unloading automatically. Tire can be cooled automatically with post cure inflator. It can adopt two-half mould and segmented mould.
Structure characteristics:
The machine consists of frame, mould opening/closing device, mould adjusting device, center mechanism, curing chamber, loading device, tire unloading device, hydraulic system, electrical system, pipeline system and post cure inflator etc.
Electrical Control system:It adopts PLC as control center, which has touch screen for display unit. The touch screen can display curing state, we can realize the man-machine conversation, such as technology choosing and parameters modification etc.
Our Machine Advantage:
  Hydraulic pressure drives the mould opening/closing and center mechanism.
  Multi-cylinder provide pressure to make even force and small deformation on platens
  The safety lock can make sure the safety for maintenance
  The mould height can be adjusted automatically
  The hydraulic system adopts Yuken, Rexroth, Parke world famous brand which can work safely, reliably and without any leakage
  Low energy consumption
  Advanced control system can finish the setting of vulcanizing and parameter changing rapidly.

Technology Parameter:
Type MLB-650/40 MLB-800/60 MLB-800/100
Largest mold closing force (T) 25-40 60 80-90
Hot plate diameter (mm) 500-650 800 800-840
Hot plate clearance (mm) 300-600 500-600 600-650
Applicable rim diameter (inch) 4"-5"-6"-8" 8"-16" 16"-18"
Mold quantity (set) 2 2 1
Diameter of piston (mm) 200 200 290
Diameter of center pole (mm) 25-35 35-40 40
Stroke of center pole (mm) 200 200 300
Working press (Mpa) 0.6-0.8 0.6-0.8 0.6-0.8
Internal air pressure (Mpa) 1.8 1.8 1.8
Internal steam pressure (Mpa) 0.8-1.5 0.8-1.5 0.8-1.5
Preshaping inter pressure (Mpa) 0.1-0.2 0.1-0.2 0.1-0.2
Motor power (KW) 7.5 7.5 11
Machine outline(LxWxH) (mm) 1200x900x2300 2400x900x2910 2400x900x2910
Weight (kg) 2500 2800 3500
 

FQA-Problems of customer concern:
About machine performance quality

1.       Q: How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.       Q:  Which PLC?
          A:  Siemens, Omron, Mitsubishi
4.       Q:  How to control the quality?
          A:  There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q:  When the guide engineer arrive at customer's factory?
           A:   If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q:  What is the warranty time?
           A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
            A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.


Machine Installation At Customer's Factory:
Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
Machine Running At Customer's Factory:
Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
Foreign Customers Visit Factory:
Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press

Press at customer' factory
Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press
Tire Tyre Curing Vulcanizing Press Machine Rubber Machine Curing Press

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier