Product Profile:
Tension Conveying Green Belt Building Machine production line is mainly used in nylon belt, EP belt, layered cotton canvas belt building and conveying belt rubberzing.
Technical specifications:
1 |
Specifications apply |
Motorcycle tyre :8″~14″/15″~21″ |
2 |
Tyre carcass Bs range |
Can adjustable 100 (Bs min:80mm, max:370mm) |
3 |
Building drum |
Drum up one time. The size can be adjustable |
4 |
Building drum rotating speed |
Max100rpm/min |
5 |
Building methods |
Single layer or multi-layer fabric, Automatic intermittent package building |
6 |
Spindle height |
Spindle height of building drum is 900mm from ground:900mm |
7 |
Curtain lining cloth maximum width |
600mm |
8 |
Curtain lining cloth max diameter |
500mm |
9 |
Cord Curtain Curly square shaft size |
32X32mm |
10 |
Productivity |
250-400 pieces per shift |
11 |
Mainly motor power |
2.2kw |
12 |
Supplying cloth frame layer qty |
1-5 layer |
13 |
Compressed air |
0.6-0.7MPa1 |
14 |
Outline |
2300X2500X2150mm |
15 |
Weight |
3000kg |
FQA-Problems of customer concern:
1.Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4.Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.Q: What is the warranty time?
A: 2 years after machine arrived at factory
2.Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions.
(1), Which can be solved by phone or Email, it will be solved in two hours.
(2) Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem).
(3)Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Tel:+86-532-86133233
Fax:+86-532-86133233
Cell:+86-178-5427-5726