Product Profile:
Tension Conveying Green Belt Building Machine production line is mainly used in nylon belt, EP belt, layered cotton canvas belt building and conveying belt rubberzing.
Our Machine Advantage:
The production line in the building process, The blank in the control of magnetic powder brake, then tension state assembly, the cloth guilding and coiling the wrinkle device ensures the cloth not wrinkle, building operation on both sides of the back and forth; material car can manually adjust the width direction of the position;in the tensioning roller device of the nearby set up an emergency stop button. The rotation speed manual control. All the electrical configuration on the same side, cloth coiling roller can be separated form, the production line can be two round-trip lamination, tensioning roller in middle position of whole line.
Specification:
Model |
DCS-1400 |
DCS-1800 |
DCS-2400 |
DCS-2600 |
Max Width of green belt(mm) |
1200 |
1600 |
2200 |
2400 |
Max Thickness of green belt(mm) |
30 |
30 |
30 |
40 |
Max diameter of reeled green belt(mm) |
3000 |
3500 |
3500 |
3500 |
Max weight of green belt (Ton) |
10 |
10 |
10 |
10 |
Max speed of green belt (m/min) |
5-30 |
5-30 |
5-30 |
5-30 |
Max thickness of rubber sheet(mm) |
1-20 |
1-20 |
1-20 |
1-20 |
Tension control mode |
Tension brake |
Tension brake |
Tension brake |
Tension brake |
Deviation correcting system |
Servo |
Servo |
Servo |
Servo |
Length of building platform(mm) |
3000 |
3000 |
3000 |
3000 |
Height of building platform (mm) |
820 |
820 |
820 |
820 |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba,ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Machine Installation at our company:
Machine running at customer's factory:
Customer Inspection:
Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.
Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.
Our products:
Tire making machines:
Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.
Conveyor belt making machines:
Vulcanizing press.
Rubber mat making machines
Inner tube making machines
Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.
Service
Plant engineering - We provide FREE layout design for new plant.
Supplier Integrity - 24/7 working machines, extremely reliable.
Plant Installation Support - Installation&commissioning service.
Spare Parts - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization - Overseas engineers available.
Training - We provide FREE training for new plant.
Raw Materials - Raw material support exported from China.
Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China