EVA foaming molding machine has advanced technology, high quality, reasonable price and good reputation.
Our factory always adhere to the honesty is the root, a promise is a promise of business philosophy, adhere to the market as the guidance, providing advanced products and high quality service.
EVA Sheet Molding Machine/EVA Foaming Machine
Our Machine Advantage:
1. Automatic plate vulcanizing machine, automatically rise, automatic exhaust, automatic fall, curing time, then the function of alarm and automatically open mold, improve production efficiency
2. Curing time, air exhaust quantity, air exhaust time and other process parameters can be set in a convenient time, and has the automatic pressure function.
Feature:
1. Special body mechanism design, fracture, deformation, prolonging the service life
2. Electric control system adopts the world famous brand PLC and man-machine interface control, not mutual interface, independent operation
3. Hydraulic control system adopts he logic circuit, not easy oil leakage and keep he pressure can we measure or define
4. With the rapid discharege valve, mould unloading quickly
5. the plunger by cold hard surface hardness for HR - 70,
Technical parameter:
Type |
XLB-Q1200*1200*4 |
XLB-Q1400*1500*6 |
XLB-Q1500*1500*6 |
Total pressure(MN) |
5.0 |
8.0 |
10.0 |
Plate size(mm) |
1200*1200 |
1400*1500 |
1500*1500 |
Plate clearance (mm) |
150 |
150 |
150 |
Piston stroke(mm) |
500 |
800 |
150 |
Plate pressure |
3.4(Mpa) |
3.8(Mpa) |
4.5(Mpa) |
Motor power(kw) |
18.5 |
26 |
33 |
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Machine Assembly At Our Factory:
Machine Ready to Delivery:
Foreign Customers Visit Factory: