• Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
  • Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
  • Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
  • Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
  • Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
  • Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant

Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant

Certification: ISO
Condition: New
Customized: Customized
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant pictures & photos
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
US $20,000-100,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
XK
Automatic Grade
Automatic
Structure
Horizontal
Color
Customized
Country of Origin
China
Brand
Maoyuanfeng
Electronics
World Famous Brand
Transport Package
Wood Carton
Trademark
maoyuanfeng
Origin
China
Production Capacity
220units/Year

Packaging & Delivery

Package Size
6600.00cm * 3600.00cm * 2700.00cm
Package Gross Weight
42000.000kg

Product Description

Product Description

The rubber mixing mill with stock blender is extensively used in rubber products manufacturing factory to get best mixing dispersion of ingredients and raw rubber. Coupled with stock blender, these mills saves labor and increase productivity.

 

Detailed Photos

1.The rolls are made from LTG-H alloy chilled cast iron by centrifugal casting technology, achieved surface hardness HS 68 ~ 75. Roll surface is grinding processed and there are  smooth, partial grooved, half grooved, complete grooved surfaces and hollow, drilled or non-drilled types according to different purpose.
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
2.Bearings for the rolls are double-row bearings, which are convenient for maintenance and have a long service life.

 

Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant



3.Motor and reducer is connected with elastic ring coupling. The reducer is hardened close transmission reducer. According to different model or customer's requirement, it could equip with single or dual output type. Connection from reducer to the rolls is with nylon rod pin universal couplings.
Global Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel PlantGlobal Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel PlantGlobal Warranty Rubber Processing Two Roll Open Mixing Mill for Rubber Rubber Wheel Plant

Product Parameters
Model XK-660 XK-550B XK-450 XK-400 XK-250
Roll Size 660×2130 550×1530 450×1200 400×1000 250×620
Production 160~170Kg/once 50~60Kg/once 30~50Kg/once 25~35Kg/once 10~15Kg/once
Motor Power(KW) 220KW 90/110KW 55KW 45/37KW 18.5KW
Line Speed(M/Min) 34.2M 28.6M 21.8M 19.3M 15.5M
Front Roll RPM 16.5 16 15.4 15.4 19.8
Gear Ration 47/ Dual Output 47.5/Dual Output 50 50 50
Roll Radio(D/L) 1: 1.24 1: 1.22 1: 1.27 1: 1.27 1: 1.10
Weight KG 49800 18500/25000 11800 7500 3300
Temp. Control Steam/Cool water
 
Emergency Stop 2 foot step on 4 sets of press buttons
 
Container Volume 55.5m³ 23m³ 16m³ 12m³
Dimension(L*W*H)mm 6200×3350×2670 5365×1946×2193 4558×1665×2015 4001×1500×1870
Transmission Low noise gear box
After Sales Service

1.As soon as our equipmemt arrive at destination,we will send our engineer to install it and adjust it.Engineer will be sent to help you installing the machine, debugging the machine,training your worker, until your machines working normally and your workforce operate skillfully(can negotiate )
2.Guide and train your workers to operate our equipment.
3.Quality gurantee period is one year from installment and adjusting(not include knife and screen)
4.Handle the letter of customers timely,solve customers questions.Collect the suggestion by kinds of ways and improve it.
5.Provide life-time Technical support for our customers.
Offer spare parts.

 

FAQ

FQA-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
          A: There are strict system and process for inspecting outsourcing parts.Choose more than 2 suppler by tender ,then find a outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, ABB.Customer can specify the brand.
3.       Q: How to control the quality?
          A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
           A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
           A: 2 years after machine arrived at factory
2.        Q: How to solve the problem?
           A: Within one hour after getting customer's problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

 

 

 

Send your message to this supplier

*From:
*To:
avatar Mr. Jim
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now