Gold Member Since 2016
Audited Supplier
Qingdao Maoyuanfeng Industry and Trade Co., Ltd.

Building Machine, Green Belt Building Machine, Tension Conveying Green Belt Building Machine manufacturer / supplier in China, offering Rubber Tension Conveying Green Belt Building Machine, Plate Vulcanizing Press Machine (Frame type) / Rubber Curing Press, Bladder Turn-up Building Machine with ISO and so on.

(/ )

Supplier Homepage Product Green Belt Building Machine Rubber Tension Conveying Green Belt Building Machine

Rubber Tension Conveying Green Belt Building Machine

FOB Price: US $150,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $150,000/ Piece
Get Latest Price
Production Capacity: 6 Units
Transport Package: Wood Carton
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Certification: SGS, ISO
  • Customized: Customized
  • Structure: Horizontal
  • Packaging: Wood Carton
  • Electronics: World Famous Brand
  • Trademark: MYF
  • Condition: New
  • Automatic Grade: Automatic
  • Country of Origin: China
  • Brand: Maoyuanfeng
  • Warranty: One Year
  • Origin: China
Product Description
Company Profile:
  Qingdao MaoYuanFeng Industry and Trade Co.,Ltd. spirit of 'the production development, the guiding ideology of science and technology first', built the first mechanical technology center of the same industry in large scale. Depending on advanced equipment and complete measurement of test and dominate to improve enterprise in rubber machinery manufacturing various types of open mill, rubber refining machine, tire curing press, conveyor belt curing press line, platen press machine and batch-off cooling line, louver vehicle research and development level, the company products are exported to the domestic twenty how many provincial and municipal Africa, South America, Southeast Asia, the Middle East and other countries and regions, and with excellent technology, first-class. Products, strict quality, rapid, timely service to win the new and old customers trust and appreciation. The company has a variety of large, medium, small mechanical processing and testing equipment, with an annual output of machinery and equipment more than 1000 sets of production capacity.

Product Profile:
  Tension Conveying Green Belt Building Machine production line is mainly used in nylon belt, EP belt, layered cotton canvas belt building and conveying belt rubberzing. The production line in the building process, The blank in the control of magnetic powder brake, then tension state assembly, the cloth guilding and coiling the wrinkle device ensures the cloth not wrinkle, building operation on both sides of the back and forth; material car can manually adjust the width direction of the position;in the tensioning roller device of the nearby set up an emergency stop button. The rotation speed manual control. All the electrical configuration on the same side, cloth coiling roller can be separated form, the production line can be two round-trip lamination, tensioning roller in middle position of whole line.

FQA-Problems of customer concern:
About machine performance quality

1.       Q:  How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       Q:  Which PLC:
          A:   Siemens, Omron, Mitsubishi
4.       Q:   How to control the quality?
          A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q:  When the guide engineer arrive at customer's factory?
           A:   If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        QWhat is the warranty time?
           A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
           A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.


Machine at Customer'factory:

Rubber Tension Conveying Green Belt Building Machine
Machine Assembly:
Rubber Tension Conveying Green Belt Building Machine
Export Loading:
Rubber Tension Conveying Green Belt Building Machine
     




Send your message to this supplier
Avatar
Ms. Amy
*From:
To: Ms. Amy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now