Gold Member Since 2016
Audited Supplier
Qingdao Maoyuanfeng Industry and Trade Co., Ltd.

Vulcanizing Machine, Vulcanizing Press, Rubber Vulcanizing Machine manufacturer / supplier in China, offering The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV, 2016 Patent Motorcycle Tire Air Bladder Hydraulic Curing Press Machine, 2017 Patent B. O. M Motorcycle Tire Vulcanizing Machine and so on.

(/ )

Supplier Homepage Product Conveyor Belt Line The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV

The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV

FOB Price: US $500,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $500,000/ Piece
Get Latest Price
Production Capacity: 5 Units
Transport Package: Wood Carton
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: XLB-Q
  • Condition: New
  • Automatic Grade: Automatic
  • Country of Origin: China
  • Brand: Maoyuanfeng
  • Warranty: One Year
  • Origin: China
  • Certification: ISO
  • Customized: Customized
  • Structure: Horizontal
  • Packaging: Wood Carton
  • Electronics: World Famous Brand
  • Trademark: MYF
Product Description
Product Profile:
    The Conveyor Belt Vulcanizing Production Line is used for curing the steel (fabric) cord conveyor belt.

Our Machine Advantage:

1)      PLC and touch screen for manual control and auto control. The auto control can realize many auto works such as mould closing, air exhausting, temperature control, vulcanization timing, alarming and discharging load when mould opening etc; the touch screen will timely show the temperature of the heating platen at each heating zone.
2)      The hydraulic cylinder is made of ZG270-500, the ram is made of close-grained chilled alloy cast iron by casting and fine grinding; the hydraulic cylinder is well sealed by rubber sealing ring.
3)      The guard edge of heating platen adopts hydraulic automatic prop up iron, under the function of four oil cylinder, the iron cushion at two sides of the lower platen will advance and retreat at the same time; there are anti-superpose iron cushion device at the two sides of platen.
4)      There is a set of valve group of temperature adjuster on each heating area for the platen. Under the controlling of PLC, it can guarantee the even temperature of each heating area.
5)      Hydraulic system: We adopt the famous brand hydraulic station from the domestic and abroad, under the controlling of PLC, it can realize the auto mould closing, air exhausting and load discharging when opening mould.
6)      Hydraulic ejecting device: To eject the cured conveyor belt from the bottom platen.
7)      The guiding device for mould closing: it is designed on the two sides of the lower mat platform, there are guiding seats for the frame board and platform, the guiding seats is produced with incline and the incline distance can be adjustable by the prop up screw.
8)      Mould opening booster: during the mould opening, the four oil cylinders below the platform will start working and forcibly pull down the platform, which can prevent the mould from sticking.


FQA-Problems of customer concern:
About machine performance quality

1.       Q: How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       QWhich brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       QWhich PLC?
          ASiemens, Omron, Mitsubishi
4.       Q: How to control the quality?
           AThere are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        QWhen the guide engineer arrive at customer's factory?
           A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        QWhat is the warranty time?
           A2 years after machine arrived at factory
2.        QHow to solve the problem?
           AWithin one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Machine Installation At Our Factory:
The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV
Machine Running At Customer's Factory:

The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV

Foreign Customers Visit:
The Rubber Conveyor Belt Vulcanizing Curing Press Production Line with ISO SGS BV


Send your message to this supplier
Avatar
Ms. Anne
*From:
To: Ms. Anne
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now